关键词: 一体化污水处理设备,小型污水处理设备
全国咨询电话
13573670168
产品中心
PRODUCT CENTER

新闻资讯

当前位置:主页 > 新闻资讯 >

印染厂废水处理设备

橡胶:latex,rubber乳液无色或乳状树液,例如猩猩木和马利筋属植物的树液,遇空气而凝结An emulsion of rubber or plastic globules in water, used in paints, adhesives, and various synthetic rubber products.胶乳橡胶或塑胶溶于水而制成的乳胶,用于油漆、粘合剂和多种合成橡胶产品Latex paint.销售:distribution sell vendition威尼斯app官方觉得or纯水湿巾可能比较好Marine incineratorSolid material, usuallyin sacks, is burnt by an automatic cycle of operation. Liquid waste is storedin a tank, heated and then pumped to the sludge burner where it is burnt in anautomatic cycle. After use the ash box can be emptied overboard.Procedure for ships waste via Marine incineratorSh养猪场废水处理设备多少钱ipboard generatedwastes can only be disposed of legally by the following two methods –1.Disposal by onboard Incineration。

2.Disposal to a shore based facilityWaste incinerationonboard sea going ships is regulated by IMO MARPOL 73/78 Resolution MEPC.176(58),adopted 10 October 2008 and IMO MARPOL Annex VI, Chapter III Regulation 16 andAppendix IV – Requirements for Control of Emissions from Ships – ShipboardIncineration. All new Incinerators installed onboard a ship on or after 1stJanuary 2000 require compliance with the above regulations and shall have IMOType Approved Certificate.? Polychlorinatedbiphenyls (PCB)? Sewage sludge andsludge oil either of which are not generated onboard the shipPo大型污水处理一体化设备lyvinyl chlorides (PVCs) can only be incinerated in IMO typeapproved incinerators. In accordance with the Helsinki Convention, all shipsare prohibited to use their incinerators whilst in the Baltic Sea area. SeeAttached “Clean Seas Guide Baltic States” for an overview of the regulationsgoverning this area.。

The following conditionsmust also be met: ? Personnel responsiblefor operation of any incinerator shall be trained.? Manufacturer’s manualfor the incinerator shall be available onboard.? Minimum flue gastemperature is 850 degrees Centigrade.? The unit shall reach600 degrees Centigrade within 5 minutes after start up.? Monitoring of flue gasoutlet temperature required.? Quantify Incineratoruse: 1% of the bunker consumption plus 2-3 hours for solid waste incineration.? Owners must decide onthe number of hours per day that the Incinerator should be allowed to work.Generally 8-12 hours per day.? Please confirm thatyour vessel has a manual for the Incinerator.? 水污染处理设备 The Operator must betrained in the use of the Incinerator by the Chief Engineer and records of thistraining must be maintained.。

XML 地图 | Sitemap 地图