关键词: 一体化污水处理设备,小型污水处理设备
全国咨询电话
13573670168
产品中心
PRODUCT CENTER

新闻资讯

当前位置:主页 > 新闻资讯 >

小型污水处理设备

The colorless or milky sap of certain plants, such as the poinsettia or milkweed, that coagulates on exposure to air.乳液无色或乳状树液,例如猩猩木和马利筋属植物的树液,遇空气而凝结An emulsion of rubber or plastic globules in water, used in paints, adhesives, and various synthetic rubber products.Latex paint.从他的一些客户反馈,就使用情况来说还是比较好的Procedure for ships waste via Marine incineratorThe availability and cost of disposal to shore based facilitiesand the trading constraints such as time in port, access at tanker terminalsand other restrictions have made option “b” less attractive. Oil and sewagesludge incineration may take place in main or auxiliary power plants orboilers, but not whilst in ports or enclosed water.? 煤矿污水处理设备 Polychlorinatedbiphenyls (PCB)。

? Garbage containingheavy metals, defined in Annex V? Sewage sludge andsludge oil either of which are not generated onboard the ship? Exhaust gas cleaning systemresidues.Polyvinyl chlorides (PVCs) can only be incinerated in IMO typeapproved incinerators. In accordance with the Helsinki Convention, all shipsare prohibited to use their incinerators whilst in the Baltic Sea area. SeeAttached “Clean Seas Guide Baltic States” for an overview of the regulationsgoverning this area.The following conditionsmust also be met: ? Personnel responsiblefor operation of any incinerator shall be trained.?养殖污水处理设备 Manufacturer’s manualfor the incinerator shall be available onboard.。

? Minimum flue gastemperature is 850 degrees Centigrade.? Monitoring of flue gasoutlet temperature required.Incinerators without IMO type approval Certificate or installedbefore 1st January 2000 can still be used for burning SLUDGE OIL and solidwaste provided this does not contain any plastic or synthetic materials. Inaddition to the above, the following criteria must be established. ?Quantify and designate Sludge preparation tanksfor ships using heavy fuels: 2% of daily consumption.?养殖污水处理设备 Quantify Incineratoruse: 1% of the bunker consumption plus 2-3 hours for solid waste incineration.。

XML 地图 | Sitemap 地图