关键词: 一体化污水处理设备,小型污水处理设备
全国咨询电话
13573670168
产品中心
PRODUCT CENTER

新闻资讯

当前位置:主页 > 新闻资讯 >

大约克种母猪

橡胶:latex,rubberAn emulsion of rubber or plastic globules in water, used in paints, adhesives, and various synthetic rubber products.胶乳橡胶或塑胶溶于水而制成的乳胶,用于油漆、粘合剂和多种合成橡胶产品销售:distribution sell vendition商品的流通销售和配销商品的过程,尤指给零售商配Procedure for ships waste via Marine incinerator2.Disposal to a shore based facilityThe availability and cost of disposal to shore based facilitiesand the trading constraints such as time in port, access at tanker terminalsand other restrictions have made option “b” less attractive. Oil and sewagesludge incineration may take place in main or auxiliary power plants orboilers, but not whilst in ports or enclosed water.W衣服照片打印机一台多少钱aste incinerationonboard sea going ships is regulated by IMO MARPOL 73/78 Resolution MEPC.176(58),adopted 10 October 2008 and IMO MARPOL Annex VI, Chapter III Regulation 16 andAppendix IV – Requirements for Control of Emissions from Ships – ShipboardIncineration. All new Incinerators installed onboard a ship on or after 1stJanuary 2000 require compliance with the above regulations and shall have IMOType Approved Certificate.。

? Polychlorinatedbiphenyls (PCB)? Refined petroleumproducts containing halogens? Sewage sludge andsludge oil either of which are not generated onboard the ship? Exhaust gas cleaning systemresidues.Polyvinyl chlorides (PVCs) can only be incinerated in IMO typeapproved incinerators. In accordance with the Helsinki Convention, all shipsare prohibited to use their incinerators whilst in the Baltic Sea area. SeeAttached “Clean Seas Guide Baltic States” for an overview of the regulationsgoverning this area.Th衣服热转印机e following conditionsmust also be met: ? Personnel responsiblefor operation of any incinerator shall be trained.。

? Minimum flue gastemperature is 850 degrees Centigrade.? The unit shall reach600 degrees Centigrade within 5 minutes after start up.? Monitoring of flue gasoutlet temperature required.Incinerators without IMO type approval Certificate or installedbefore 1st January 2000 can still be used for burning SLUDGE OIL and solidwaste provided this does not contain any plastic or synthetic materials. Inaddition to the above, the following criteria must be established. ?Quantify and designate Sludge preparation tanksfor ships using heavy fuels: 2% of daily consumption.?酸碱废水处理工艺流程图 Quantify Incineratoruse: 1% of the bunker consumption plus 2-3 hours for solid waste incineration.。

XML 地图 | Sitemap 地图