关键词: 一体化污水处理设备,小型污水处理设备
全国咨询电话
18053642433
产品中心
PRODUCT CENTER

新闻资讯

当前位置:主页 > 新闻资讯 >

大型污水处理车(淤泥固化处理车)

Marine incineratorSolid material, usuallyin sacks, is burnt by an automatic cycle of operation. Liquid waste is storedin a tank, heated and then pumped to the sludge burner where it is burnt in anautomatic cycle. After use the ash box can be emptied overboard.Wa污水处理厂有编制吗ste incinerationonboard sea going ships is regulated by IMO MARPOL 73/78 Resolution MEPC.176(58),adopted 10 October 2008 and IMO MARPOL Annex VI, Chapter III Regulation 16 andAppendix IV – Requirements for Control of Emissions from Ships – ShipboardIncineration. All new Incinerators installed onboard a ship on or after 1stJanuary 2000 require compliance with the above regulations and shall have IMOType Approved Certificate.。

大型污水处理车(移动式污水处理车价格)

It is prohibited toincinerate: ? Residues of cargoessubject MARPOL Annex I, II, III? Polychlorinatedbiphenyls (PCB)? Garbage containingheavy metals, defined in Annex V? Exhaust gas cleaning systemresidues.The following conditionsmust also be met: ? Personnel responsiblefor operation of any incinerator shall be trained.? Manufacturer’s manualfor the incinerator shall be available onboard.? Minimum flue gastemperature is 850 degrees Centigrade.? The unit shall reach600 degrees Centigrade within 5 minutes after start up.? Monitoring of flue gasoutlet temperature required.I污水处理厂的建设施工流程ncinerators without IMO type approval Certificate or installedbefore 1st January 2000 can still be used for burning SLUDGE OIL and solidwaste provided this does not contain any plastic or synthetic materials. Inaddition to the above, the following criteria must be established. ?Quantify and designate Sludge preparation tanksfor ships using heavy fuels: 2% of daily consumption.。

大型污水处理车(大型干湿分离清污车)

? Owners must decide onthe number of hours per day that the Incinerator should be allowed to work.Generally 8-12 hours per day.? Consideration shouldbe made for ships trading in ECA areas (e.g. Baltic Sea) where incineration isnot allowed. Put up suitable notices.? The Operator must betrained in the use of the Incinerator by the Chief Engineer and records of thistraining must be maintained.P污水处理厂的建设施工流程lease keep this information accessible for the daily use of thestaff who are assigned to operate the incinerator。

XML 地图 | Sitemap 地图