关键词: 一体化污水处理设备,小型污水处理设备
全国咨询电话
18053642433
产品中心
PRODUCT CENTER

新闻资讯

当前位置:主页 > 新闻资讯 >

喷水喷头(农用喷灌的喷头)

Procedure for ships waste via Marine incinerator2.Disposal to a shore based facilityWaste incinerationonboard sea going ships is regulated by IMO MARPOL 73/78 Resolution MEPC.176(58),adopted 10 October 2008 and IMO MARPOL Annex VI, Chapter III Regulation 16 andAppendix IV – Requirements for Control of Emissions from Ships – ShipboardIncineration. All new Incinerators installed onboard a ship on or after 1stJanuary 2000 require compliance with the above regulations and shall have IMOType Approved Certificate.? Refined petroleumproducts containing halogens? 洗车房污水处理器设备 Sewage sludge andsludge oil either of which are not generated onboard the ship。

喷水喷头(大棚喷雾水管和喷头)

? Exhaust gas cleaning systemresidues.Polyvinyl chlorides (PVCs) can only be incinerated in IMO typeapproved incinerators. In accordance with the Helsinki Convention, all shipsare prohibited to use their incinerators whilst in the Baltic Sea area. SeeAttached “Clean Seas Guide Baltic States” for an overview of the regulationsgoverning this area.The following conditionsmust also be met: ? Personnel responsiblefor operation of any incinerator shall be trained.? Minimum flue gastemperature is 850 degrees Centigrade.? The unit shall reach600 degrees Centigrade within 5 minutes after start up.I洗车废水如何处理ncinerators without IMO type approval Certificate or installedbefore 1st January 2000 can still be used for burning SLUDGE OIL and solidwaste provided this does not contain any plastic or synthetic materials. Inaddition to the above, the following criteria must be established. ?Quantify and designate Sludge preparation tanksfor ships using heavy fuels: 2% of daily consumption.。

喷水喷头(高压水旋转喷头)

? Quantify Incineratoruse: 1% of the bunker consumption plus 2-3 hours for solid waste incineration.? Owners must decide onthe number of hours per day that the Incinerator should be allowed to work.Generally 8-12 hours per day.? Consideration shouldbe made for ships trading in ECA areas (e.g. Baltic Sea) where incineration isnot allowed. Put up suitable notices.? Please confirm thatyour vessel has a manual for the Incinerator.? The Operator must betrained in the use of the Incinerator by the Chief Engineer and records of thistraining must be maintained.威尼斯app官方觉造纸厂废水处理得or纯水湿巾可能比较好。

XML 地图 | Sitemap 地图