关键词: 一体化污水处理设备,小型污水处理设备
全国咨询电话
18053642433
产品中心
PRODUCT CENTER

新闻资讯

当前位置:主页 > 新闻资讯 >

污水处理厂劳务报价清单(管道安装预算报价表)

Marine incineratorSolid material, usuallyin sacks, is burnt by an automatic cycle of operation. Liquid waste is storedin a tank, heated and then pumped to the sludge burner where it is burnt in anautomatic cycle. After use the ash box can be emptied overboard.Procedure for ships waste via Marine incineratorShipboard generatedwastes can only be disposed of legally by the following two methods –1.Disposal by onboard Incineration2.Disposal to a shore based facilityW最新污水处理招聘信息aste incinerationonboard sea going ships is regulated by IMO MARPOL 73/78 Resolution MEPC.176(58),adopted 10 October 2008 and IMO MARPOL Annex VI, Chapter III Regulation 16 andAppendix IV – Requirements for Control of Emissions from Ships – ShipboardIncineration. All new Incinerators installed onboard a ship on or after 1stJanuary 2000 require compliance with the above regulations and shall have IMOType Approved Certificate.。

污水处理厂劳务报价清单(污水管道工程报价明细表)

It is prohibited toincinerate: ? Residues of cargoessubject MARPOL Annex I, II, III? Polychlorinatedbiphenyls (PCB)? Refined petroleumproducts containing halogens? Sewage sludge andsludge oil either of which are not generated onboard the ship? Exhaust gas cleaning systemresidues.? Manufacturer’s manualfor the incinerator shall be available onboard.? Minimum flue gastemperature is 850 degrees Centigrade.? 城乡污水处理厂建设流程 The unit shall reach600 degrees Centigrade within 5 minutes after start up.。

污水处理厂劳务报价清单(污水处理厂劳务施工怎样报价)

? Monitoring of flue gasoutlet temperature required.Incinerators without IMO type approval Certificate or installedbefore 1st January 2000 can still be used for burning SLUDGE OIL and solidwaste provided this does not contain any plastic or synthetic materials. Inaddition to the above, the following criteria must be established. ?Quantify and designate Sludge preparation tanksfor ships using heavy fuels: 2% of daily consumption.? Owners must decide onthe number of hours per day that the Incinerator should be allowed to work.Generally 8-12 hours per day.?污水处理厂调节池图片 Consideration shouldbe made for ships trading in ECA areas (e.g. Baltic Sea) where incineration isnot allowed. Put up suitable notices.。

XML 地图 | Sitemap 地图