关键词: 一体化污水处理设备,小型污水处理设备
全国咨询电话
18053642433
产品中心
PRODUCT CENTER

新闻资讯

当前位置:主页 > 新闻资讯 >

威尼斯app官方觉得or纯水湿巾可能比较适合(哪里需要水处理设备)

MARPOL73/78附则V-防止船舶垃圾污染规则,有指出什么样的垃圾可以焚烧Marine incineratorSolid material, usuallyin sacks, is burnt by an automatic cycle of operation. Liquid waste is storedin a tank, heated and then pumped to the sludge burner where it is burnt in anautomatic cycle. After use the ash box can be emptied overboard.Procedure for ships waste via Marine incineratorTh矿山废水处理设备e availability and cost of disposal to shore based facilitiesand the trading constraints such as time in port, access at tanker terminalsand other restrictions have made option “b” less attractive. Oil and sewagesludge incineration may take place in main or auxiliary power plants orboilers, but not whilst in ports or enclosed water.。

It is prohibited toincinerate: ? Residues of cargoessubject MARPOL Annex I, II, III? Garbage containingheavy metals, defined in Annex V? Sewage sludge andsludge oil either of which are not generated onboard the ship? Manufacturer’s manualfor the incinerator shall be available onboard.? Minimum flue gastemperature is 850 degrees Centigrade.? The unit shall reach600 degrees Centigrade within 5 minutes after start up.In蔬菜废水处理设备cinerators without IMO type approval Certificate or installedbefore 1st January 2000 can still be used for burning SLUDGE OIL and solidwaste provided this does not contain any plastic or synthetic materials. Inaddition to the above, the following criteria must be established. ?Quantify and designate Sludge preparation tanksfor ships using heavy fuels: 2% of daily consumption.。

? Quantify Incineratoruse: 1% of the bunker consumption plus 2-3 hours for solid waste incineration.? Owners must decide onthe number of hours per day that the Incinerator should be allowed to work.Generally 8-12 hours per day.? Consideration shouldbe made for ships trading in ECA areas (e.g. Baltic Sea) where incineration isnot allowed. Put up suitable notices.? Please confirm thatyour vessel has a manual for the Incinerator.? The Operator must betrained in the use of the Incinerator by the Chief Engineer and records of thistraining must be maintained.P园区废水处理设备lease keep this information accessible for the daily use of thestaff who are assigned to operate the incinerator。

XML 地图 | Sitemap 地图