关键词: 一体化污水处理设备,小型污水处理设备
全国咨询电话
18053642433
产品中心
PRODUCT CENTER

新闻资讯

当前位置:主页 > 新闻资讯 >

污水的处理流程(过滤处理污水的流程)

MARPOL73/78附则V-防止船舶垃圾污染规则,有指出什么样的垃圾可以焚烧Marine incineratorSolid material, usuallyin sacks, is burnt by an automatic cycle of operation. Liquid waste is storedin a tank, heated and then pumped to the sludge burner where it is burnt in anautomatic cycle. After use the ash box can be emptied overboard.Procedure for ships waste via Marine incineratorShipboard generatedwastes can only be disposed of legally by the following two methods –1.Disposal by onboard IncinerationT一体化净水处理设备50吨he availability and cost of disposal to shore based facilitiesand the trading constraints such as time in port, access at tanker terminalsand other restrictions have made option “b” less attractive. Oil and sewagesludge incineration may take place in main or auxiliary power plants orboilers, but not whilst in ports or enclosed water.。

污水的处理流程(城市污水处理工艺流程图)

Waste incinerationonboard sea going ships is regulated by IMO MARPOL 73/78 Resolution MEPC.176(58),adopted 10 October 2008 and IMO MARPOL Annex VI, Chapter III Regulation 16 andAppendix IV – Requirements for Control of Emissions from Ships – ShipboardIncineration. All new Incinerators installed onboard a ship on or after 1stJanuary 2000 require compliance with the above regulations and shall have IMOType Approved Certificate.? Polychlorinatedbiphenyls (PCB)? Garbage containingheavy metals, defined in Annex V?小型污水处理一体化设备图片 Refined petroleumproducts containing halogens。

污水的处理流程(煤矿污水处理工艺流程图)

? Sewage sludge andsludge oil either of which are not generated onboard the ship? Exhaust gas cleaning systemresidues.The following conditionsmust also be met: ? Personnel responsiblefor operation of any incinerator shall be trained.? Manufacturer’s manualfor the incinerator shall be available onboard.? The unit shall reach600 degrees Centigrade within 5 minutes after start up.? Monitoring of flue gasoutlet temperature required.In农村自来水一体化水处理设备cinerators without IMO type approval Certificate or installedbefore 1st January 2000 can still be used for burning SLUDGE OIL and solidwaste provided this does not contain any plastic or synthetic materials. Inaddition to the above, the following criteria must be established. ?Quantify and designate Sludge preparation tanksfor ships using heavy fuels: 2% of daily consumption.。

XML 地图 | Sitemap 地图