关键词: 一体化污水处理设备,小型污水处理设备
全国咨询电话
18053642433
产品中心
PRODUCT CENTER

新闻资讯

当前位置:主页 > 新闻资讯 >

威尼斯app官方觉得or纯水湿巾可能比较好(实验室污水处理工艺流程图)

Solid material, usuallyin sacks, is burnt by an automatic cycle of operation. Liquid waste is storedin a tank, heated and then pumped to the sludge burner where it is burnt in anautomatic cycle. After use the ash box can be emptied overboard.Waste incinerationonboard sea going ships is regulated by IMO MARPOL 73/78 Resolution MEPC.176(58),adopted 10 October 2008 and IMO MARPOL Annex VI, Chapter III Regulation 16 andAppendix IV – Requirements for Control of Emissions from Ships – ShipboardIncineration. All new Incinerators installed onboard a ship on or after 1stJanuary 2000 require compliance with the above regulations and shall have IMOType Approved Certificate.I一体化污水处理工艺图t is prohibited toincinerate: ? Residues of cargoessubject MARPOL Annex I, II, III。

实验室污水处理工艺流程图(污水处理工艺流程的实验报告)

? Polychlorinatedbiphenyls (PCB)? Garbage containingheavy metals, defined in Annex V? Sewage sludge andsludge oil either of which are not generated onboard the ship? Exhaust gas cleaning systemresidues.The following conditionsmust also be met: ? Personnel responsiblefor operation of any incinerator shall be trained.? Manufacturer’s manualfor the incinerator shall be available onboard.? Minimum flue gastemperature is 850 degrees Centigrade.?一体化污水处理工艺图 The unit shall reach600 degrees Centigrade within 5 minutes after start up.。

实验室污水处理工艺流程图(实验室污水处理论文6篇)

? Monitoring of flue gasoutlet temperature required.? Owners must decide onthe number of hours per day that the Incinerator should be allowed to work.Generally 8-12 hours per day.? Consideration shouldbe made for ships trading in ECA areas (e.g. Baltic Sea) where incineration isnot allowed. Put up suitable notices.? Please confirm thatyour vessel has a manual for the Incinerator.? The Operator must betrained in the use of the Incinerator by the Chief Engineer and records of thistraining must be maintained.Pl一体化污水泵站多少钱ease keep this information accessible for the daily use of thestaff who are assigned to operate the incinerator。

XML 地图 | Sitemap 地图