关键词: 一体化污水处理设备,小型污水处理设备
全国咨询电话
18053642433
产品中心
PRODUCT CENTER

新闻资讯

当前位置:主页 > 新闻资讯 >

酸洗废水处理设备厂家(混凝土池内壁防腐)

MARPOL73/78附则V-防止船舶垃圾污染规则,有指出什么样的垃圾可以焚烧Procedure for ships waste via Marine incinerator2.Disposal to a shore based facilityThe availability and cost of disposal to shore based facilitiesand the trading constraints such as time in port, access at tanker terminalsand other restrictions have made option “b” less attractive. Oil and sewagesludge incineration may take place in main or auxiliary power plants orboilers, but not whilst in ports or enclosed water.Wa屠宰污水处理设备ste incinerationonboard sea going ships is regulated by IMO MARPOL 73/78 Resolution MEPC.176(58),adopted 10 October 2008 and IMO MARPOL Annex VI, Chapter III Regulation 16 andAppendix IV – Requirements for Control of Emissions from Ships – ShipboardIncineration. All new Incinerators installed onboard a ship on or after 1stJanuary 2000 require compliance with the above regulations and shall have IMOType Approved Certificate.。

酸洗废水处理设备厂家(混凝土池污水内壁防腐)

It is prohibited toincinerate: ? Residues of cargoessubject MARPOL Annex I, II, III? Garbage containingheavy metals, defined in Annex V? Refined petroleumproducts containing halogens? Sewage sludge andsludge oil either of which are not generated onboard the ship? Exhaust gas cleaning systemresidues.Polyvinyl chlorides (PVCs) can only be incinerated in IMO typeapproved incinerators. In accordance with the Helsinki Convention, all shipsare prohibited to use their incinerators whilst in the Baltic Sea area. SeeAttached “Clean Seas Guide Baltic States” for an overview of the regulationsgoverning this area.? Manufacturer’s manualfor the incinerator shall be available onboard.? Minimum flue gastemperature is 850 degrees Centigrade.? 污水处理设备厂家 The unit shall reach600 degrees Centigrade within 5 minutes after start up.。

酸洗废水处理设备厂家(上海酸洗设备厂)

? Monitoring of flue gasoutlet temperature required.Incinerators without IMO type approval Certificate or installedbefore 1st January 2000 can still be used for burning SLUDGE OIL and solidwaste provided this does not contain any plastic or synthetic materials. Inaddition to the above, the following criteria must be established. ?Quantify and designate Sludge preparation tanksfor ships using heavy fuels: 2% of daily consumption.? Quantify Incineratoruse: 1% of the bunker consumption plus 2-3 hours for solid waste incineration.? 一体化污水处理设备价格是多少 Owners must decide onthe number of hours per day that the Incinerator should be allowed to work.Generally 8-12 hours per day.。

XML 地图 | Sitemap 地图