关键词: 一体化污水处理设备,小型污水处理设备
全国咨询电话
13573670168
产品中心
PRODUCT CENTER

新闻资讯

当前位置:主页 > 新闻资讯 >

地磅150吨一台多少钱(唐山衡器厂联系方式)

Marine incineratorProcedure for ships waste via Marine incineratorShipboard generatedwastes can only be disposed of legally by the following two methods –1.Disposal by onboard Incineration2.Disposal to a shore based facilityT餐厨垃圾一体化设备he availability and cost of disposal to shore based facilitiesand the trading constraints such as time in port, access at tanker terminalsand other restrictions have made option “b” less attractive. Oil and sewagesludge incineration may take place in main or auxiliary power plants orboilers, but not whilst in ports or enclosed water.。

地磅150吨一台多少钱(小型污水处理器多少钱一台)

Waste incinerationonboard sea going ships is regulated by IMO MARPOL 73/78 Resolution MEPC.176(58),adopted 10 October 2008 and IMO MARPOL Annex VI, Chapter III Regulation 16 andAppendix IV – Requirements for Control of Emissions from Ships – ShipboardIncineration. All new Incinerators installed onboard a ship on or after 1stJanuary 2000 require compliance with the above regulations and shall have IMOType Approved Certificate.It is prohibited toincinerate: ? Residues of cargoessubject MARPOL Annex I, II, III? Polychlorinatedbiphenyls (PCB)? Refined petroleumproducts containing halogens? Sewage sludge andsludge oil either of which are not generated onboard the ship?小型污水处理一体化设备 Exhaust gas cleaning systemresidues.。

地磅150吨一台多少钱(150吨地磅价格价格)

The following conditionsmust also be met: ? Personnel responsiblefor operation of any incinerator shall be trained.? Manufacturer’s manualfor the incinerator shall be available onboard.? Minimum flue gastemperature is 850 degrees Centigrade.? The unit shall reach600 degrees Centigrade within 5 minutes after start up.? Monitoring of flue gasoutlet temperature required.In污水处理设备包括哪些cinerators without IMO type approval Certificate or installedbefore 1st January 2000 can still be used for burning SLUDGE OIL and solidwaste provided this does not contain any plastic or synthetic materials. Inaddition to the above, the following criteria must be established. ?Quantify and designate Sludge preparation tanksfor ships using heavy fuels: 2% of daily consumption.。

XML 地图 | Sitemap 地图